References
Backup Diesel Generator Installation
and Maintenance Project
Location: Harney's Law Firm, Road Town, Tortola, BVIand Maintenance Project
Generator: FG Wilson P688
Power Rating: 688 kVa
Electrical Specifications: 3 phase, 208 V System
Transfer Switch: 2000 amp Cutler Hammer ATS
Residential Solar Power Project
Location: Hodges Creek, Tortola, BVISolar Array: 24 Kyocera 135W Panels
Battery Backup Inverter System: Outback 7.2 kW
Solar Array (Longbay)
Location: Longbay, Tortola, BVISolar System: 2.6 kW
Panels: Kyocera 130
Backup Inverter System: Outback 14.4 kW
Battery Bank: Lifeline AGM
Solar Project
Location: Cooper Island Beach Club, Cooper Island, BVIProject Type: Hybrid Island Grid
Solar System Capacity: 20 kW Kyocera Panels
Battery Backup Capacity: 45 kW
Generator Capacity: 2 x 40 kW FG Wilson Generators
Solar Array (Little Dix)
Location: Little Dix, Virgin GordaSolar System: 6k
Panels: W Sharp Solar Array
Backup Inverter Capacity: 14 kW
Client Feedback: "I am very pleased with the job at the Villa, and with the neat finish. Am currently using about 40 units a day whereas before your recent intervention ... it was more like 100... thanks very much for a job well done." — Tony D
Wind Turbine Installation and Service
Location: Peter Island Resort, Tortola, BVITurbines: 2 x 250 kW WES Wind Turbines
Details: Working with Wolverine Power to install and service wind turbines to offset diesel consumption to power the island.
Solar Electric, Pool Heating and
Hot Water
Location: Road Town, Tortola, BVIHot Water
Solar Pool Heating: 10,000 Gallon Pool
Domestic Hot Water: 120 Gallon System
Background Solar Power Solution: 7 kW Backup Power,
2 kW Array
Combined Solar Electric and Solar Hot Water
Location: Central Tortola, BVISolar Array: 4 kW
Backup Inverter Capacity: 7 kW
Solar Hot Water Capacity: 4 to 6 people



























